Good morning Board,
I have a 1993 EMON in service with The SAR V2. The alternator charging system has a "hand/off/automatic" field controller as well. The SAR V2 has failed. Years ago I inventoried a Next Step regulator for this eventuality. I'm not certain how to integrate the wiring into the EMON's A1 channel.
Shore side charging is by a Heat Freedom 10.
The house bank is 3 group 27 gel and the starting battery is also a group 27 gel.
While at anchor solar panels are controlled through a solar regulator.
Both the Freedom 10 charging and Solar charging go through a shunt and are displayed n the Aux Amps channel.
Thanks in advance!
John English
Morgan 382#75
San Francisco