I currently have the Next-12P Next Step regulator and the EM2-H1 Energy Monitor. The current wiring has a connection from the EM2-H1 TB2-1 SLR to the Nextstep Regulator ABS connection point. The new NS2 does not have a connection point on either TB1 or TB2. There is a connection on the Next -12p Parallel that is also on the NS2 which I will use.
Where do I connect the EM2 12P SLR connection to the NS2 interface. What is the effect of not having this connection available to the new regulator?
